top of page
Search

What Is a Change Order and How We Avoid Them

Writer: Cassidy Burns
Cassidy Burns
May 12, 2025
3 min read

Updated: May 15, 2025

In the world of construction, few terms cause more anxiety for homeowners and developers than “change order.” These unexpected adjustments to the original construction plan can lead to delays, budget increases, and frustration if not handled properly. At AVEC Construction, serving the Northern Virginia region, we believe the best change orders are the ones you never have to make.


Here’s what a change order is, why they happen, and—most importantly—how our proactive approach helps keep your project on track and on budget from day one.



What Is a Change Order?


A change order is a formal document used to record an amendment to the original construction contract. This can include changes to:


  • Scope of work

  • Materials or finishes

  • Design or layout

  • Schedule or timelines

  • Cost estimates


Change orders may be initiated by the client, the contractor, or due to unforeseen circumstances such as structural issues discovered during demolition. While sometimes necessary, frequent or last-minute changes can disrupt the entire flow of a construction project.



Common Causes of Change Orders


While every project is unique, some common reasons for change orders include:


  • Incomplete or vague project plans

  • Unclear expectations during the planning stage

  • Discovery of unexpected site conditions

  • Client-initiated design changes mid-project

  • Budget limitations not aligned with design selections


At AVEC, we’ve seen how change orders—especially those made mid-project—can add stress and cost to what should be an exciting process. That’s why we take extra steps before construction even begins.




How AVEC Construction Helps You Avoid Change Orders


At AVEC Construction, we believe preparation is the best way to protect your investment and timeline. Our proactive process includes:


1. Thoughtful Pre-Construction Walkthroughs


Before any hammer swings or foundation is poured, we conduct comprehensive walkthroughs of the site and your architectural plans. During these sessions, our team:


  • Reviews your vision in detail

  • Anticipates construction challenges

  • Flags design decisions that may lead to complications

  • Aligns the build team and subcontractors on project goals


These walkthroughs ensure everyone is on the same page and helps identify potential red flags early—before they become costly problems.





2. Transparent and Detailed Initial Pricing


We provide clients with thorough initial estimates that account for both base build costs and potential contingencies. Our pricing isn’t a “best-case guess”—it’s rooted in realistic labor, material, and timeline expectations. This clarity allows clients to make informed decisions and reduces the need for scope or budget adjustments later on.



3. Collaborative Design Support


If you’re still finalizing finishes, fixtures, or layout changes, our team offers guidance to help align your design with your budget. By working hand-in-hand with designers, architects, and engineers, we ensure the vision is executable before we break ground.



When a Change Order Is Needed


Despite careful planning, there are rare times when a change order is necessary. Whether it’s a newly inspired design idea or a structural discovery behind an old wall, we handle every change order with:


  • Clear communication

  • Timely documentation

  • Updated budgets and timelines

  • Your approval—always


We treat your investment with respect and keep you in control throughout the process.



Building Better in Northern Virginia


Whether you're remodeling a kitchen in Arlington, building an addition in Fairfax, or developing a new custom home in Loudoun County, AVEC Construction brings clarity, precision, and professionalism to every phase of the project.


By avoiding unnecessary change orders through thoughtful planning and transparent pricing, we keep your project on time, on budget, and on track—just the way it should be.



Ready to build with confidence?Contact AVEC Construction today to schedule your pre-construction consultation.



Happy Building!



Office Address: 1009 Duke St. Alexandria, VA 

 
 
 

Comments


  • Facebook
  • Instagram
  • LinkedIn
White_Green AVEC Logo_edited.png

At AVEC Construction, we take pride in transforming visions into reality. As a premier Northern Virginia and DC General Contractor, we specialize in crafting exceptional outdoor and indoor living spaces that elevate your lifestyle.

2025 | AVEC Construction

Let's stay connected!

+1 (703) 975 - 6509

1009 Duke St.,

Alexandria, VA 22314

bottom of page